Skip to content
Bellevue Kitchen Pros logoBellevue Kitchen Pros
Open menu
Remodeled kitchen in a Bellevue home with white shaker cabinets and a quartz island

Bellevue, Washington

Kitchen Remodeling in Bellevue, WA

Bellevue Kitchen Pros is an expert local team for kitchen remodeling in Bellevue, WA. No juggling a designer, a contractor and separate trades. We design, handle City permits and build your new kitchen.

  • No budget surprisesA clear written scope and price before any work starts.
  • One team, start to finishWe design, handle permits and build. No juggling trades.
  • Permits handled for youWe file with the City of Bellevue when your scope needs it.
  • A home you can live inDust walls, a set schedule and weekly updates while we work.

You get a clear written price and schedule before work starts. Book Now or call (425) 600-3942.

Services

Bellevue kitchen remodeling services

We cover every part of a Bellevue kitchen remodel under one contract: design, cabinets, countertops, layout changes, permits and the trade work behind the walls. Pick the service that matches your project, or read the full kitchen remodel guide for Bellevue first.

Pricing

Kitchen remodeling prices in Bellevue

Cost vs Value 2025 puts the Pacific region average at $29,728 for a minor midrange kitchen remodel, $86,480 for a major midrange remodel and $171,950 for an upscale major remodel.

Minor refresh, midrange

$29,728

Pacific average, 2025 (Cost vs Value)

Same layout. New cabinet fronts, counters, sink, faucet, appliances

Major remodel, midrange

$86,480

Pacific average, 2025 (Cost vs Value)

Full gut. Semi-custom cabinets, new layout of 30 feet of cabinets, new flooring and lighting

Major remodel, upscale

$171,950

Pacific average, 2025 (Cost vs Value)

Custom cabinets, stone counters, built-in fridge, pro-style range and hood

Washington sales tax applies to the full contract price, and the Department of Revenue rate table lists Bellevue at 10.3% for October to December 2026.

See full pricing

Our process

Our process: seven steps from first call to final walkthrough

Our kitchen remodel process has seven steps. You get a written plan, a fixed scope and a permit plan before any demolition starts, and you sign off on the work before the last payment.

  1. Step 01

    Call or chat

    Tell us about your kitchen, your budget and your timing. The Planner can help you sort this out first.

  2. Step 02

    Home visit and measure

    We measure the room, open the sink cabinet, check the electrical panel and note the age of the house. A pre-1978 home gets a lead paint check plan.

  3. Step 03

    Design

    You see the layout and finishes on screen before you choose. Changes are cheap at this stage and costly later.

  4. Step 04

    Written bid and contract

    Every line is priced, including sales tax and permit fees. You get Washington's required Disclosure Statement before work begins.

  5. Step 05

    Permits

    We file through MyBuildingPermit when your scope needs it and order cabinets and long lead items at the same time.

  6. Step 06

    Build

    Demolition, rough-in, inspections, then cabinets, counters, tile and fixtures. You get a weekly update with what is next.

  7. Step 07

    Final walkthrough

    We walk the kitchen with you, fix every item on the punch list and hand over lien releases from our suppliers before final payment.

Step 4 and step 7 follow the Washington State Department of Labor and Industries (L&I) Hire Smart guide. L&I tells homeowners to get bids in writing, pay as phases are done, and ask for lien releases.

Equipment

Equipment we use, and why it matters to you

The tools on your job decide how clean, safe and accurate your kitchen remodel will be. Here is what we bring and what each one does for you.

The lead gear matters most in older homes. The U.S. Environmental Protection Agency says anyone paid to disturb paint in a home built before 1978 must be certified in lead-safe work practices.

Laser measure and laser level
Cabinets and counters line up to the wall, so the stone fabricator cuts once
3D kitchen design software
You see the layout, door styles and colors before you pay for them
Moisture meter
Finds hidden damp under the sink and in subfloors before new cabinets go in
Zip-up dust walls and floor protection
Keeps dust in the kitchen and off your floors and stairs
HEPA air scrubber and HEPA vacuum
Pulls fine dust from the air during demolition and sanding
Lead test kits and lead-safe gear
Used in pre-1978 homes before we disturb any paint
Cabinet lifts and clamps
Holds upper cabinets steady while we fasten them, so doors hang level
Stud finder and circuit tracer
Finds framing, wires and pipes before we cut into a wall

Projects

Before and after: Bellevue kitchens

These before and after sets show the kinds of changes most Bellevue homeowners ask for: more light, more counter space and a layout that fits how they cook.

Each set below comes from a project page with the full story. Browse all of them on our projects page.

Before photo of a dated galley kitchen with oak cabinets and a closed wall
Before
After photo of the same kitchen opened into an L-shape with a quartz peninsula
After

Case study 1: Lake Hills rambler, wall opened to the dining room

Time
About 4 weeks of design and permits, then about 10 weeks on site.
Budget range
Inside the major midrange band.
Lake Hills rambler project
Before photo of a small condo kitchen with laminate counters
Before
After photo of the condo kitchen with walnut cabinets and white quartz
After

Case study 2: Downtown condo, same footprint

Time
About 3 weeks on site after cabinets arrived.
Budget range
Near the minor midrange band.
Downtown condo project

Reviews

What Bellevue homeowners say: kitchen remodeling reviews

Read what homeowners say about the work, the crew and the process.

We were nervous about living through a remodel with two kids. The crew put up a dust wall on day one and cleaned up every night. They told us each Friday what was coming the next week, and the schedule held.
Priya R., Lake Hills
Our bid listed sales tax and the permit fees as separate lines. The other two bids we got did not, and that's how we knew we were comparing apples to apples.
Mark and Dana T., Newport Hills
The inspector found an old splice in the wall that nobody knew about. They showed me a photo, explained the fix and the cost before they did it. No surprises on the final bill.
Helen W., Northeast Bellevue
Our condo board had strict work hours. They planned the loud demo days around them and got the HOA sign-off without me chasing anyone.
Jason L., Downtown Bellevue
I wanted to keep my budget under control, so they helped me reface the cabinets instead of replacing them. It looks new and we spent the savings on a better range.
Carmen D., Crossroads
Wall calendar marking each phase of a kitchen remodel timeline

Timeline

How long does a kitchen remodel take in Bellevue?

Most kitchen remodels take about 6 to 9 weeks of work once construction starts. With design, permits and ordering, the whole project often takes 3 to 5 months, according to HomeGuide's kitchen cost guide.

Our week-by-week kitchen remodel timeline shows each phase, from demolition to final inspection.

Building permit card posted in a kitchen window during a permitted remodel

Permits

Do you need a permit for a kitchen remodel in Bellevue?

You do not need a building permit to replace kitchen cabinets or countertops in Bellevue. You do need permits to add or move circuits, change a gas line, move plumbing fixtures, build new walls or move a load-bearing wall.

Read does a kitchen remodel require a permit for a yes or no list by task.

Kitchen remodel planning items laid out in decision order from budget to tile

Planning order

When remodeling a kitchen, what comes first?

Plan and budget first, then design, then permits and ordering, then demolition. On site, the work behind the walls comes before anything you see: plumbing, gas and wiring, then inspection, then drywall, cabinets, counters and finishes.

Our guide on when remodeling a kitchen what comes first covers the common mistakes at each step.

Homeowner asking a contractor questions from a printed list during a kitchen walk-through

Hiring

How to choose kitchen remodeling contractors in Bellevue

Check three things before you sign: an active Washington contractor registration with a bond, a written contract with the price including sales tax, and a payment plan tied to finished work.

Use our list of questions to ask a contractor for a kitchen remodel when you interview remodelers.

Older Bellevue rambler kitchen opened to the studs with a dust wall and new wiring

Older homes

Remodeling the kitchen in an older Bellevue home

Homes built before 1978 may have lead paint, so the remodeler must use lead-safe work practices. Older homes also hide surprises behind the walls, so budget time and money for them.

See our kitchen remodel for older homes in Bellevue page for a plan that keeps the surprises small.

FAQ

Kitchen remodeling FAQs

How do you survive a kitchen remodel?

Set up a small temporary kitchen in another room before demolition starts. A microwave, a toaster oven, an electric kettle, a mini fridge and a dish tub cover most meals. Plan simple meals for the weeks with no sink. Ask your remodeler for a weekly schedule so you know which days are loud and dusty.

Can I stay in my home during a kitchen remodel?

Yes, most Bellevue families stay home during a kitchen remodel. Dust walls, floor protection and a HEPA air scrubber keep the rest of the house livable. Plan to be away for a day or two during heavy demolition or floor finishing, and keep kids and pets out of the work zone.

Do kitchen remodelers in Bellevue offer free estimates?

Many do, and Bellevue Kitchen Pros starts with an estimate at your home. Before the visit, have your budget range, a list of must-haves and any photos you like. You can also run your numbers through the Planner first, so the visit starts with a real budget.

How far in advance should I book a kitchen remodeler in Bellevue?

Start talking to remodelers two to four months before you want work to begin. Design, permits and cabinet orders take weeks. Semi-custom and custom cabinets can take longer. If you want the kitchen done by a set date, such as a holiday or a move, count back from that date.

Where can I find a kitchen remodeler near me in Bellevue?

Bellevue Kitchen Pros is at 14206 SE 36th St #100, Bellevue, WA 98006. We serve homes across Bellevue's neighborhood areas, from Downtown to Newport Hills. Call (425) 600-3942 to book a visit, or open the Kitchen Planner chat to get a budget and checklist first.

Get started

Start your kitchen remodel in Bellevue

Call (425) 600-3942 to book a visit, or open the Kitchen Planner chat to get your budget split and a free planning checklist in about five minutes.

Not ready to talk yet? Start with the complete Bellevue kitchen remodel guide, then read kitchen remodel cost by scope before you set your budget.

Bellevue Kitchen Pros14206 SE 36th St #100, Bellevue, WA 98006(425) 600-3942

Tell us about the kitchen

This form goes to Bellevue Kitchen Pros. A coordinator will call or email you to set up a visit.