Bellevue, Washington
Kitchen Remodeling in Bellevue, WA
Bellevue Kitchen Pros is an expert local team for kitchen remodeling in Bellevue, WA. No juggling a designer, a contractor and separate trades. We design, handle City permits and build your new kitchen.
- No budget surprisesA clear written scope and price before any work starts.
- One team, start to finishWe design, handle permits and build. No juggling trades.
- Permits handled for youWe file with the City of Bellevue when your scope needs it.
- A home you can live inDust walls, a set schedule and weekly updates while we work.
You get a clear written price and schedule before work starts. Book Now or call (425) 600-3942.
Services
Bellevue kitchen remodeling services
We cover every part of a Bellevue kitchen remodel under one contract: design, cabinets, countertops, layout changes, permits and the trade work behind the walls. Pick the service that matches your project, or read the full kitchen remodel guide for Bellevue first.









Pricing
Kitchen remodeling prices in Bellevue
Cost vs Value 2025 puts the Pacific region average at $29,728 for a minor midrange kitchen remodel, $86,480 for a major midrange remodel and $171,950 for an upscale major remodel.
Minor refresh, midrange
$29,728
Pacific average, 2025 (Cost vs Value)
Same layout. New cabinet fronts, counters, sink, faucet, appliances
Major remodel, midrange
$86,480
Pacific average, 2025 (Cost vs Value)
Full gut. Semi-custom cabinets, new layout of 30 feet of cabinets, new flooring and lighting
Major remodel, upscale
$171,950
Pacific average, 2025 (Cost vs Value)
Custom cabinets, stone counters, built-in fridge, pro-style range and hood
Washington sales tax applies to the full contract price, and the Department of Revenue rate table lists Bellevue at 10.3% for October to December 2026.
Our process
Our process: seven steps from first call to final walkthrough
Our kitchen remodel process has seven steps. You get a written plan, a fixed scope and a permit plan before any demolition starts, and you sign off on the work before the last payment.
Step 01
Call or chat
Tell us about your kitchen, your budget and your timing. The Planner can help you sort this out first.
Step 02
Home visit and measure
We measure the room, open the sink cabinet, check the electrical panel and note the age of the house. A pre-1978 home gets a lead paint check plan.
Step 03
Design
You see the layout and finishes on screen before you choose. Changes are cheap at this stage and costly later.
Step 04
Written bid and contract
Every line is priced, including sales tax and permit fees. You get Washington's required Disclosure Statement before work begins.
Step 05
Permits
We file through MyBuildingPermit when your scope needs it and order cabinets and long lead items at the same time.
Step 06
Build
Demolition, rough-in, inspections, then cabinets, counters, tile and fixtures. You get a weekly update with what is next.
Step 07
Final walkthrough
We walk the kitchen with you, fix every item on the punch list and hand over lien releases from our suppliers before final payment.
Step 4 and step 7 follow the Washington State Department of Labor and Industries (L&I) Hire Smart guide. L&I tells homeowners to get bids in writing, pay as phases are done, and ask for lien releases.
Equipment
Equipment we use, and why it matters to you
The tools on your job decide how clean, safe and accurate your kitchen remodel will be. Here is what we bring and what each one does for you.
The lead gear matters most in older homes. The U.S. Environmental Protection Agency says anyone paid to disturb paint in a home built before 1978 must be certified in lead-safe work practices.
- Laser measure and laser level
- Cabinets and counters line up to the wall, so the stone fabricator cuts once
- 3D kitchen design software
- You see the layout, door styles and colors before you pay for them
- Moisture meter
- Finds hidden damp under the sink and in subfloors before new cabinets go in
- Zip-up dust walls and floor protection
- Keeps dust in the kitchen and off your floors and stairs
- HEPA air scrubber and HEPA vacuum
- Pulls fine dust from the air during demolition and sanding
- Lead test kits and lead-safe gear
- Used in pre-1978 homes before we disturb any paint
- Cabinet lifts and clamps
- Holds upper cabinets steady while we fasten them, so doors hang level
- Stud finder and circuit tracer
- Finds framing, wires and pipes before we cut into a wall
Projects
Before and after: Bellevue kitchens
These before and after sets show the kinds of changes most Bellevue homeowners ask for: more light, more counter space and a layout that fits how they cook.
Each set below comes from a project page with the full story. Browse all of them on our projects page.


Case study 1: Lake Hills rambler, wall opened to the dining room
- Time
- About 4 weeks of design and permits, then about 10 weeks on site.
- Budget range
- Inside the major midrange band.


Case study 2: Downtown condo, same footprint
- Time
- About 3 weeks on site after cabinets arrived.
- Budget range
- Near the minor midrange band.


Case study 3: Northeast Bellevue split-level, island added
- Time
- About 8 weeks on site.
- Budget range
- Between the minor and major midrange bands.
Reviews
What Bellevue homeowners say: kitchen remodeling reviews
Read what homeowners say about the work, the crew and the process.
We were nervous about living through a remodel with two kids. The crew put up a dust wall on day one and cleaned up every night. They told us each Friday what was coming the next week, and the schedule held.
Our bid listed sales tax and the permit fees as separate lines. The other two bids we got did not, and that's how we knew we were comparing apples to apples.
The inspector found an old splice in the wall that nobody knew about. They showed me a photo, explained the fix and the cost before they did it. No surprises on the final bill.
Our condo board had strict work hours. They planned the loud demo days around them and got the HOA sign-off without me chasing anyone.
I wanted to keep my budget under control, so they helped me reface the cabinets instead of replacing them. It looks new and we spent the savings on a better range.

Timeline
How long does a kitchen remodel take in Bellevue?
Most kitchen remodels take about 6 to 9 weeks of work once construction starts. With design, permits and ordering, the whole project often takes 3 to 5 months, according to HomeGuide's kitchen cost guide.
Our week-by-week kitchen remodel timeline shows each phase, from demolition to final inspection.

Permits
Do you need a permit for a kitchen remodel in Bellevue?
You do not need a building permit to replace kitchen cabinets or countertops in Bellevue. You do need permits to add or move circuits, change a gas line, move plumbing fixtures, build new walls or move a load-bearing wall.
Read does a kitchen remodel require a permit for a yes or no list by task.

Planning order
When remodeling a kitchen, what comes first?
Plan and budget first, then design, then permits and ordering, then demolition. On site, the work behind the walls comes before anything you see: plumbing, gas and wiring, then inspection, then drywall, cabinets, counters and finishes.
Our guide on when remodeling a kitchen what comes first covers the common mistakes at each step.

Hiring
How to choose kitchen remodeling contractors in Bellevue
Check three things before you sign: an active Washington contractor registration with a bond, a written contract with the price including sales tax, and a payment plan tied to finished work.
Use our list of questions to ask a contractor for a kitchen remodel when you interview remodelers.

Older homes
Remodeling the kitchen in an older Bellevue home
Homes built before 1978 may have lead paint, so the remodeler must use lead-safe work practices. Older homes also hide surprises behind the walls, so budget time and money for them.
See our kitchen remodel for older homes in Bellevue page for a plan that keeps the surprises small.
Areas we serve
Kitchen renovation in Bellevue neighborhoods
We work across Bellevue's neighborhood areas. Each one has its own homes, its own common projects and its own planning notes.

Kitchen remodeling in Downtown Bellevue
condos and high-rises with HOA rules.
View Downtown Bellevue
Kitchen remodeling in West Bellevue
Enatai, Surrey Downs and the neighborhoods near Mercer Slough.
View West Bellevue
Kitchen remodeling in Northwest Bellevue
ramblers, ranch estates and big rebuilds.
View Northwest Bellevue
Kitchen remodeling in Northeast Bellevue
1960s to 1980s homes in Sherwood Forest and nearby.
View Northeast Bellevue
Kitchen remodeling in Bridle Trails
large lots in the city's equestrian area.
View Bridle Trails
Kitchen remodeling in Crossroads
apartments, condos and established houses.
View Crossroads
Kitchen remodeling in Lake Hills
late-1950s planned community homes.
View Lake Hills
Kitchen remodeling in Eastgate
homes along I-90 near Bellevue College.
View Eastgate
Kitchen remodeling in Factoria
homes near the Marketplace at Factoria.
View Factoria
Kitchen remodeling in Newport Hills
Newport Hills, Lake Heights and Newport Shores.
View Newport Hills
FAQ
Kitchen remodeling FAQs
How do you survive a kitchen remodel?
Set up a small temporary kitchen in another room before demolition starts. A microwave, a toaster oven, an electric kettle, a mini fridge and a dish tub cover most meals. Plan simple meals for the weeks with no sink. Ask your remodeler for a weekly schedule so you know which days are loud and dusty.
Can I stay in my home during a kitchen remodel?
Yes, most Bellevue families stay home during a kitchen remodel. Dust walls, floor protection and a HEPA air scrubber keep the rest of the house livable. Plan to be away for a day or two during heavy demolition or floor finishing, and keep kids and pets out of the work zone.
Do kitchen remodelers in Bellevue offer free estimates?
Many do, and Bellevue Kitchen Pros starts with an estimate at your home. Before the visit, have your budget range, a list of must-haves and any photos you like. You can also run your numbers through the Planner first, so the visit starts with a real budget.
How far in advance should I book a kitchen remodeler in Bellevue?
Start talking to remodelers two to four months before you want work to begin. Design, permits and cabinet orders take weeks. Semi-custom and custom cabinets can take longer. If you want the kitchen done by a set date, such as a holiday or a move, count back from that date.
Where can I find a kitchen remodeler near me in Bellevue?
Bellevue Kitchen Pros is at 14206 SE 36th St #100, Bellevue, WA 98006. We serve homes across Bellevue's neighborhood areas, from Downtown to Newport Hills. Call (425) 600-3942 to book a visit, or open the Kitchen Planner chat to get a budget and checklist first.
Get started
Start your kitchen remodel in Bellevue
Call (425) 600-3942 to book a visit, or open the Kitchen Planner chat to get your budget split and a free planning checklist in about five minutes.
Not ready to talk yet? Start with the complete Bellevue kitchen remodel guide, then read kitchen remodel cost by scope before you set your budget.